Shandong Enon Automation Technology Co., Ltd.

All
  • All
  • Title
Home> Products> Lost Wax Investment Casting Equipment> Dewaxing Autoclave> Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation
Investment Casting Wax Tree Dewaxing Machine Automation

Investment Casting Wax Tree Dewaxing Machine Automation

Payment Type:L/C,T/T
Incoterm:FOB,CFR,CIF,EXW
Min. Order:1 Piece/Pieces
Transportation:Ocean,Land
Model:
  • YN-DTF-1200Z
  • $23240- /Piece/Pieces

23240USD

  • Product Attributes
  • Packaging & Delivery
  • Product Description
  • Supply Ability & Additional Information
Product Attributes

Model No.YN-DTF-1200Z

BrandEnon

Place Of OriginChina

Old And NewNew

Video Factory InspectionProvided

Mechanical Test ReportProvided

Marketing TypeNew Product 2020

Core Component Warranty Period1 Year

Core ComponentsPlc

Warranty Period1 Year

Core Selling PointEasy To Operate

Out-of-warranty ServiceVideo Technical Support, Spare Parts

Where To Provide Local Services (in Which Countries Are There Overseas Service Outlets)None

Showroom Location (in Which Countries Are There Sample Rooms Overseas)None

Applicable IndustryManufacturing Plant

Packaging & Delivery
Selling Units: Piece/Pieces
Package Type: WOODEN BOX
Picture Example:

The file is encrypted. Please fill in the following information to continue accessing it

Product Description

Investment Casting Machine Wax Tree Dewaxing Machine Automatic Sell

1.technical parameter
Model YN-DTF-1200Z
working space φ1200×1500mm
working pressure 0.85MPa
working temperature 185ºC
Design pressure 0.95MPa
Voltage regulating range 0~0.85MPa
Boost rate 0.6MPa/5s
power 380V/50Hz 153kw
dimensions 4250×2050×2150
weight 4.2T
2. Pre-Operation Preparation and Inspection
1. Personnel Qualifications and Protective Preparations
Operators must undergo professional training and be familiar with the equipment's performance, operating procedures, and safety precautions. They may only begin work after passing the assessment. Before starting work, operators must wear complete protective equipment, including high-temperature-resistant gloves, an insulated apron, goggles, and non-slip work shoes. Scarves, bracelets, and other accessories that could easily become entangled or damaged are strictly prohibited.
2. Equipment Appearance and Environmental Inspection
Inspect the overall appearance of the equipment to confirm that the vessel has no obvious deformation, cracks, or rust, that connecting pipes are not damaged or loose, and that valves open and close freely and are clearly labeled.
Clean the equipment area and ensure that the operating area is free of flammable and explosive items and debris. Ensure at least 1.5 meters of safe operating space is maintained, that ventilation is adequate, and that emergency exits are clear.
Inspect safety warning signs for integrity and legibility. Replace any blurred or missing signs promptly.
3. Core System Pre-Inspection
Pressure System: Verify that the safety valve and pressure gauge are within their calibration validity period, that the dial is clear and undamaged, and that the pointer is reset to zero. Manually test the safety valve to confirm that it trips normally and resets after pressure relief.
Temperature System: Check that the temperature controller, thermocouple, and other temperature measuring components are securely connected and displaying normal activity. Perform a preheat test on the temperature control system to confirm that the temperature display matches the actual heating status.
Interlocking Device: Test the mechanical and electromagnetic interlocks of the kettle door. After closing the door, attempt to open it without releasing pressure to confirm that it cannot be opened. Simulate overpressure and overtemperature conditions to verify that the equipment automatically shuts off heating and triggers an alarm.
4. Water Level and Heating System
For electric heating equipment, verify that the water level gauge displays normally, the water level is within the specified range (generally 1/2-2/3), the water replenishment device is operating properly, the heating tube surface is free of scale and damage, and the wiring terminals are secure and not loose.
 
Supply Ability & Additional Information

PackagingWOODEN BOX

TransportationOcean,Land

Place of OriginChina

Supply Ability120PCS/YEAR

CertificateISO 9001:2015

Payment TypeL/C,T/T

IncotermFOB,CFR,CIF,EXW

Home> Products> Lost Wax Investment Casting Equipment> Dewaxing Autoclave> Investment Casting Wax Tree Dewaxing Machine Automation

Copyright © 2025 Shandong Enon Automation Technology Co., Ltd. All rights reserved.Privacy Policy

Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send